What do you need to know when you call for your pool installation? Read More About Initial Scheduling



What do you need to do to prepare for the installation?
Read More About Customer Preparation



What to expect when we arrive for the pool installation?
Read More About When We Arrive
 
C & D's Installers Home Page About C & D's Installers C & D's Installers - Pool Installation C & D's Installers - Other Services C & D's Installers - FAQs C & D's Installers - Service Area Contact C & D's Installers
C & D's Installers - Our Pool Installation Process C & D's Installers Pool Installation Process - What to Expect C & D's Installers Pool Installation Process - Initial Scheduling C & D's Installers Pool Installation Process - Customer Preparation C & D's Installers Pool Installation Process - When We Arrive
C & D's Installers Pool Installation Process:  When We Arrive
 

The Pool Installers will need to know the following:

POOL LOCATION
Where you want the pool and the filtration system. Please have these areas planned and possibly marked before we arrive.

POOL
We will need access to the pool and all of its parts (anything we will be installing ). The crew will need to take an inventory to make sure everything needed is there.

PERMIT
The permit needs to be obtained before the pool installation. The location you have picked for the pool must meet the townships/county’s codes, being proper distances away from property lines and existing structures. The ground also needs to be excavated according to the townships codes.

POWER SOURCE
We will need access to an electrical outlet for tools needed for the installation.

GROUND LEVELING
The foreman or excavator will stake out the area and use a transit level, this will take an accurate measurement. The first 6 inches are included. After measuring the ground the foreman or excavator will let you know how much leveling is needed and what the cost will be. The homeowners authorization is needed before any ground leveling can begin.

AREA FOR WASTE MATERIAL
Designate a area in the yard for waste materials from the ground leveling to be piled (dirt, roots, rock, grass etc.) Please have this area planned before we arrive.

FILLING THE POOL
Once the liner is put in we will need to begin filling the pool to set it in place (1-2 inches of water). If you plan on using your hose check to see if it will reach to where the pool is going. If a water truck is scheduled tell the foreman what time it should be arriving.

FILTER EXPLANATION
After the installation is complete the installer will explain how to operate the filtration system and how to connect the vacuum. Please have the person(s) who will be taking care of the pool present for this explanation.

CHEMICALS
Any questions you have regarding chemicals should be directed to the store where the pool was purchased. Our staff is not knowledgeable in this area.

Ground Leveling

ACCESS
We need a 6 ft. opening to get into the yard if the pool size is 18 ft. round or larger. For oval pools 12x18 or larger. If the pool is smaller than size’s mentioned we can bring smaller equipment that will fit threw a standard gate opening. Please have this opening ready before the installation date given. This is the customers responsibility to have ready.

CLEAN UP
Expect to have to clean up your yard after the pool is installed. The pool site is a construction site. There will probably be some tire tracks where the machine has to ride on the yard to get to the pool site and the sand. There will be waste material left over that will be piled up in a designated area in the yard. This material will consist of dirt, rocks, roots etc.. C&D’s Installers does not remove anything from the customers yard. How much or what size the pile will be will depend on the amount of ground leveling needed to be done, every yard is different.

 